Re-roofing, planned around your building and budget

Repairs no longer holding? We plan and install a new roof system that fits your building, your budget and your schedule.

Standing-seam metal panels going on over new underlayment on a long roof, with more three-story buildings of the complex behind

Signs it’s time to re-roof

  • Leaks across the roof

    Repairs that don’t hold point to a system-wide problem.

  • Wet insulation

    It stops insulating and holds water against the deck.

  • An aging membrane

    Brittle, shrinking or cracking, with failing seams.

  • Widespread storm damage

    Hail or wind damage across large areas.

  • Planned capital work

    Replace on your schedule, not the roof’s.

What’s included

  • An assessment of the existing roof, deck and drainage
  • Our advice on a re-cover or a full tear-off
  • TPO, metal and other systems matched to your building
  • A phasing plan for access, staging and occupants
  • Supervised installation, with progress updates
  • A final walkthrough, photos and the warranty paperwork
Single-story brick buildings with new metal roofs in evening light

Reviews and recent work

5.0 from 99+ Google reviews

“They installed a TPO roofing system and the quality of their work was outstanding. The crew worked fast, efficiently, and at a very reasonable price.”

Bo B.New build with a TPO roof · The Colony, TX

“They did an outstanding job. The gentleman, Caesar and Amildo, were very professional and knowledgeable explaining every detail of the contract.”

Michael F.Roof installation
Single-story commercial building under construction with a dark roof
Finished tan metal building with a large door opening and a side entry door
New steel roof trusses on top of an existing single-story building
RCAT Licensed Roofing ContractorRoofing Contractors Association of Texas (opens in a new tab)

Get a roof assessment

Tell us about the building and your timeline. Plans and specs are welcome but not required.

Homeowner? Get a free roof inspection

Takes about a minute.

What do you need?
Add timing, project details or documents (optional)

Building type, roof system and size, bid due date, links to plans: whatever you have. “Not sure” is fine.

Photos or documents (optional)

Up to 8 photos or PDFs, 10 MB each.

Add files Choose files, or drag them here

    We’ll only use your details to respond to this request, and we never sell them. See our privacy policy.